Bainsvlei Development land
2012-02-15
Calling all serious Investors.

Easily Accessible From 3 roads
Bainsvlei Corner plot with business rights Ideal for factory warehouse, storage facilities and offices in area zoned commercial. The possibilities are enormous Stunning Investment Opportunity. Sectional title for individual offices and spaces. Calling all serious investors. This is where your future business should be located. Absolute prime location in The Heart of the Bainsvlei proposed business area if only the best spot will do. This is a valuable property with a Prime Spot with excellent visibility. You cannot afford to let this slip through your fingers. Lots of Development Opportunities. The Property Is Easily Accessible from 3 roads. The land has lots of exposure value to the slow traffic and is on busy Road in the Bainsvlei.
Permissible uses (storage facilities and related uses)
In the vicinity are a church, Satelite station of the Police, A Post office and variety of business uses amongst which an existing storage business, the Wiesbaden Resort as well as a filling station and small trading store business and the Wiesnebenan resort.
Special use 56
Property size: 6.5225ha.
Warehousing and renting out of self-storage facilities
There are no restrictive conditions in the title deed.
Maximum permissible floor area
a. Total floor area of storage facilities shall not exceed 26000sqm
b. Total floor area of house will be used as dwelling for caretaker,125sqm
c. Total floor area of an office building for admin purposes, 100sqm
Maximum permissible height
The maximum permissible height alongside Abrahamskraal Drive shall not exceed 2 (two) storeys
Parking
Storage: 1 Parking per 100sqm floor area
Offices: 2.5 Parkings per 100sqm floor area
Vechile entrances and exits
To the satisfaction of Director Urban Planning and Housing
Street - building lines
Abrahamskraal drive: 95m from centerline of road
Other roads: 9m
Additional Requirements
The site development plan must indicate the proposed phases of the development without specific dates of development attached to the phases. A revised plan for the development of each phase will be submitted to the Local Authority as and when such a development is to be undertaken It will be the prerogative of the Council at any of these stages to request a traffic impact study (which are applicable in this case and already in progress). The first phase is planned to consist of the erection of 200 garage type buildings of 20sqm – 25sqm each with a total coverage of 4000sqm.